C1D1 re-rack

Taking it all apart.
Building it back up.

The real room, the parts and the people behind the re-rack. A dated record from the floor.

Ordered by original photo and video capture dates, shown in Eastern time. Hover or focus a photo for its original color; select it for a closer look.

Before the room came apart

The original machine and the first trays of removed fittings.

The machine is out

The exposed rails, removed pieces and the crew in the cleared room.

Everything on the bench

Components laid out for the teardown and cleaning process. Every piece gets its place before the rebuild.

The next chapter is still being built: rack assembly, mounting the machine, and the new piping.

Tool first, then drawings

Dated from the files and the spec.

    The room, Option B

    The room as Cody’s planning tool lays it out. Drag to orbit, scroll to zoom.
    Planning render, not a photo
    View
    Show
      The room and the rails

      The planning tool itself

      The original planning tools. Press to open one here, or open it in a tab.

      The welder drawings

      Four sheets rasterised from the PDF, shown as plates. Press one to read it full size.

        The record

        From the files.
        The record